Integrating Weighted Delay Index (WDI) with Dynamic Critical Path Analysis for Enhanced Delay Assessment in Construction Projects. (2026). Journal of Civil Engineering Researchers, 8(1). https://doi.org/10.61186/JCER.8.1.47